Bradley logoBradleyPaper Towel Dispensers · At the sink

Bradley 2017-000000 Towel Waste Unit Recessed Single Multi Fold 4 9 Gallon

Manufacturer model
2017-000000
Selected SKU
2017-000000
Project pricingRequest project pricingReference pricing is unavailable for this model/SKU. Request a project quote.

No order or payment is created here. Your selected model goes to the existing secure Quote Request.

Product overview

Details at a glance.

The Bradley 2017-0000 Bradex paper towel dispenser with waste receptacle is a perfect choice for modern washrooms. It has a capacity to handle 1100 single-fold, 800 multi-fold or 600 C-fold towels. This recessed-mount unit has a solid stainless steel construction for durability. Its 4.9-gal. receptacle is removable for easy maintenance and the satin finish lends a stylish look to the unit. Features: Accepts C-fold/multi-fold/single-fold paper towels Satin finish adds to the style Cabinet door is secured with a heavy-duty piano hinge for sturdiness Tumbler locks provided for secure access to the cabinet Waste receptacle has a capacity of 4.9 gallons

Specifications

Model details.

Brand
Bradley
Product family
Paper Towel Dispensers
Manufacturer model
2017-000000
Catalog SKU
2017-000000
Supplied specification text
Brand Bradley Product Type Paper Towel Dispenser w/ Waste Receptacle Finish Satin Paper Towel Type C-Fold/Multi-Fold/Single-Fold Mount Type Recessed Bin Capacity 4.9 gal. Dispenser Capacity 600 C-Fold/800 Multi-Fold/1100 Single-Fold Manufacturer Part Number 2017-000000 Collection Bradex Dispenser Type Manual Material Stainless Steel Width 13" Depth 6" Height 55" Wall Opening Width 11.75" Wall Opening Depth 5.75" Wall Opening Height 53.62" Warranty 1 Year Certification and Listings ADA
Attachments

Model documents.

Check that the manufacturer document is current and matches your selected configuration. Confirm any required permission before using or sharing it.

Ready for a project review?

Reference prices support project planning and apply only to the listed model or SKU. Final configuration, price, freight, tax, availability, and timing are confirmed in your written project quote.

Request project pricing
Quote List0 items in your Quote List