Commercial restroom planning tool

Build a clearer bathroom partition budget.

Choose a material, stall count, layout, and accessibility configuration for a straightforward starting material budget. Then send the selection to Partition Stalls for a project-specific quote.

Phase 1 calculator

Configure the restroom layout you are planning.

Start with the closest configuration. The final quote is where Partition Stalls confirms dimensions, mounting, screens, accessories, project location, and any installation scope.

01 Choose a partition material
02 How many toilet compartments?
03 Choose the closest layout
04 Is an accessibility configuration needed?
Owner-set planning ranges

Three material budget paths, built for comparison.

The calculator contains 144 approved material-and-configuration combinations for these Phase 1 materials. Each comparison card pairs the lowest current starting budget with a planning allowance of up to two times that starting point. Select your configuration above to see its specific starting budget.

Solid Plastic (HDPE)$2,023.00–$4,046.00

Conventional-privacy starting budget through a 2× planning allowance.

Higher privacy: $3,364.00–$6,728.00 — starting budget through a 2× planning allowance.

Read the Solid Plastic (HDPE) guide
Phenolic$2,282.04–$4,564.08

Conventional-privacy starting budget through a 2× planning allowance.

Read the Phenolic guide
Before requesting a final quote

The calculator starts the budget conversation. It does not replace project review.

Use the result to compare a likely starting material budget. Send it with drawings, dimensions, photos, or a scope list so the final quote can reflect your exact restroom.

  • Included in the calculator: material, stall count, layout, privacy option where available, and accessibility configuration.
  • Confirmed in the quote: field dimensions, mounting, screens, accessories, freight, tax, availability, delivery, installation scope, and final pricing.
Request a confirmed commercial quote

Pricing matrix reviewed for PStalls in October 2026. Phase 1 includes Powder Coated Steel, Solid Plastic (HDPE), and Phenolic.