Start with what is known
A quote request can start before every selection is final. Include the known project location, contact information, and project type, then attach the strongest available plans, measurements, photos, or scope notes.
Division 10 toilet partition bid packages
General contractors, subcontractors, and specifiers can include the project specification section, such as CSI 10 21 13 Toilet Compartments, with the latest restroom plans and accessory schedule. Identify the bid date if known, specified manufacturer or approved-alternate requirements, quantities, and whether the request is for material supply or installation review.
Share any project requirements for toilet partition submittals or shop drawings so the required documentation can be reviewed. Sending a bid package does not establish drawing-production services, design approval, code compliance, or acceptance of the installation scope.
Prepare the core package
- Upload the latest plan, restroom sketch, or field dimensions.
- List the approximate number of toilet compartments, privacy screens, urinal screens, and accessories.
- Note a material direction or say that comparison help is needed.
- Add the project city and state so delivery and installation-scope questions can be reviewed.
Add model and accessory references
- Paste any Bobrick, ASI, Bradley, or other model references into the bulk model field.
- State whether the reference is exact, an approved alternate, or an early planning direction.
- Include required finish, mounting, capacity, electrical, and accessibility documentation where available.
Confirm what happens after submission
The request is a quote inquiry, not an order. Final manufacturer or series, dimensions, mounting, accessories, freight, taxes, availability, delivery timing, installation scope, and final pricing are confirmed by Partition Stalls for the actual project.