Bradley 2A05-11 Diplomat Paper Towel Dispenser & Waste Receptacle Surface Mounted - Satin
Bradley logoBradley
Paper Towel Dispensers · At the sink

Bradley 2A05-11 Diplomat Paper Towel Dispenser & Waste Receptacle Surface Mounted - Satin

Manufacturer model
2A05-11
Catalog SKU
2A05-11
Project pricingRequest project pricingThis catalog record has no one-to-one match to the current owner-approved price book.

No order or payment is created here. Your selected model goes to the existing secure Quote Request.

Product details

What the supplied record says.

The Bradley 2A05-11 Diplomat paper towel dispenser and the waste receptacle unit facilitates surface mounting and is ideal for high-traffic areas. It comes with a waste receptacle equipped with a keyed tumbler lock and can be removed easily when needed for convenient disposal. This towel dispenser can dispense 800 multi-fold or 600 C-fold paper towels. It has a hinged service door that is sturdy and allows smooth opening and closing. Features: Accepts multi-fold or C-fold paper towels Satin finish on exposed surfaces adds style to the unit 5lbs. of force is enough for operation Universal keying system 12-gallon waste receptacle is removable ADA certified Specifications: Brand Bradley Product Type Paper Towel Dispenser w/ Waste Receptacle Finish Satin Paper Towel Type C-Fold/Multi-Fold Mount Type Surface Bin Capacity 12 gal. Dispenser Capacity 600 C-Fold/800 Multi-Fold Manufacturer Part Number 2A05-11 Collection Diplomat Dispenser Type Folded Material Stainless Steel Width 17.12" Depth 8.68" Height 56" Warranty 1 Year Certification and Listings ADA Technical Files: Specifications Sheet

Technical files

Documents for this model.

Files are shown only when an actual technical file was supplied and mapped into Partition Stalls managed storage.

Ready for a project review?

Product records support commercial selection and project quoting. Reference pricing, when shown, is matched to the owner-approved price list for an exact model or SKU only; final configuration, price, freight, tax, availability, and timing are confirmed in the written project quote.

Request project pricing