Bradley 2017-1100 Towel Waste Unit Surface Single Multi Fold 49 Gallon
Bradley logoBradley
Paper Towel Dispensers · At the sink

Bradley 2017-1100 Towel Waste Unit Surface Single Multi Fold 49 Gallon

Manufacturer model
2017-1100
Catalog SKU
2017-1100
Project pricingRequest project pricingThis catalog record has no one-to-one match to the current owner-approved price book.

No order or payment is created here. Your selected model goes to the existing secure Quote Request.

Product details

What the supplied record says.

The Bradley 2017-1100 paper towel dispenser with waste receptacle add elegance, style, and function to commercial washrooms. It can hold and dispense 1100 single-fold, 800 multi-fold or 600 C-fold paper towels. Its waste receptacle has a capacity of 4.9 gallons and handles paper waste effectively without any spillage. This surface-mounted towel dispenser is crafted using solid stainless steel to last for years to come. Features: Designed for surface mounting and constructed using durable type 304 stainless steel Receptacle with leak-proof molded plastic insert for convenience Easy removal of waste receptacle insert by opening the cabinet door Waste receptacle has a capacity of 4.9 gallons Specifications: Brand Bradley Product Type Paper Towel Dispenser w/ Waste Receptacle Finish Satin Paper Towel Type C-Fold/Multi-Fold/Single-Fold Mount Type Surface Bin Capacity 4.9 gal. Dispenser Capacity 600 C-Fold/800 Multi-Fold/1100 Single-Fold Manufacturer Part Number 2017-1100 Dispenser Type Manual Material Stainless Steel Width 13" Depth 6" Height 55" Warranty 1 Year Certification and Listings ADA Technical Files: Specifications Sheet

Technical files

Documents for this model.

Files are shown only when an actual technical file was supplied and mapped into Partition Stalls managed storage.

Ready for a project review?

Product records support commercial selection and project quoting. Reference pricing, when shown, is matched to the owner-approved price list for an exact model or SKU only; final configuration, price, freight, tax, availability, and timing are confirmed in the written project quote.

Request project pricing